Requesting orbital elements · CelesTrak …
Loading SGP4 propagator ok
Tracking Sentinel-2A · 2B · 2C · 1A · 1C 5 / 5
Loading watchlist 10 sites
Predicting Sentinel-2 passes …
Click anywhere to skip
Live · 5 satellites tracked in your browser

Ground truth from orbit.

Alpha Orbit compares what companies promise about the world's biggest builds with what satellites actually see. AI data centers, chip fabs, gigafactories. Dated, measured, side by side.

WATCHLIST · NOW TRACKINGStargate AbileneAbilene, Texas
ORCL
Next Sentinel-2 passcomputing…
Last passcomputing…Predicted from orbit, before clouds
LIVE
Sentinel-2AOptical · 10 m----
Sentinel-2BOptical · 10 m----
Sentinel-2COptical · 10 m----
Sentinel-1ARadar · all weather----
Sentinel-1CRadar · all weather----
Positions computed in your browser with SGP4 from CelesTrak orbital elements.
CLAIM VS. ORBIT · REAL EXAMPLE

Stargate Abilene, as orbit saw it.

Real Sentinel-2 images of the campus outside Abilene, Texas, from January 2024 to last week, next to what the companies said in public. Drag through twelve passes, or tap a statement to jump to the pass that checks it.

Stargate Abilene

Crusoe · Oracle · OpenAI · Abilene, Texas

Real imagery

    Statements are quoted or summarized from the linked public reports. The orbit notes are our reading of 10 m images.

    Sentinel-2 satellite image of the Stargate Abilene campusPassReal image · 10 m
    Sentinel-2 passes since Jan 2024440
    Mostly clear passes219
    Typical wait for a clear look~5 days

    Contains modified Copernicus Sentinel data 2024–2026. Aerial photo: USDA NAIP (public domain). Imagery accessed through Microsoft Planetary Computer.

    REAL PASSES, COMPUTED LIVE

    When orbit looks next.

    Every site on the watchlist, with the next and last time a Sentinel-2 satellite flies over it in daylight. Worked out in your browser from today's orbital elements. Clouds still decide what each pass can see.

    SiteOwnerNext Sentinel-2 passLast pass
    Computing passes…
    Pass = the site falls inside the satellite's 290 km imaging strip with the sun up.
    HOW IT WORKS

    Two kinds of AI, pointed at the same project.

    A language model reads the promise. A vision model reads the ground. The gap between them is the signal. Read the full method

    01

    Read the claim

    Earnings calls · filings · permits

    Every dated promise about a site gets pulled out: what, how much, by when, and who said it.

    02

    Watch the site

    Sentinel-2 · Sentinel-1 radar · sharp captures

    Free public satellites revisit every site every few days. Sharp commercial captures are bought only when something changes.

    03

    Measure progress

    Cleared land · roofs · cooling · turbines

    What a megaproject can't hide from above is counted and dated, pass after pass.

    04

    Score the gap

    Orbit Gap · alerts · evidence

    When observed progress falls behind the stated path, you get an alert with the dated images that show it.

    COVERAGE

    The builds that move markets.

    Megaprojects are big enough to see from free satellites, and the claims about them move stocks. That's where Alpha Orbit works.

    AI data centers

    The gigawatt campuses behind the AI trade: halls, cooling, substations and on-site gas turbines.

    Hyperscalers · neoclouds · power

    Chip fabs

    New fabs where the gap between groundbreaking and first wafers decides a supply chain.

    Foundries · equipment makers

    Gigafactories

    Battery and EV plants, from cleared land to finished-car lots.

    EV makers · battery suppliers

    LNG and power plants

    Export terminals, new turbines and grid substations that feed the build-out.

    Energy · utilities

    Ports and shipping

    Container stacks and ship counts at the ports that carry the parts.

    Logistics · trade

    Mines

    Pits, stockpiles and tailings at the copper and lithium mines the build-out needs.

    Materials
    WHAT LANDS IN YOUR INBOX

    Alerts that come with their evidence.

    Every alert links to the dated images behind it. These samples show the format; the projects are made up.

    Project Meridian: 2 of 4 halls enclosed; management guided all 4 by end of Q3

    At the pace orbit has seen since May, about 3 halls will be enclosed by Sep 30, not 4.

    Behind stated pace
    Project Sable fab: second cleanroom roof complete, two weeks ahead of the permit schedule

    Roof closed on the Jul 18 pass; the county schedule shows late July.

    Ahead of stated pace
    Project Halden gigafactory: no new construction across six passes

    No change in cleared area or foundations since May 30. The company said nothing about a pause.

    Stalled, unannounced
    THE ORBIT REPORT

    One email a week. The biggest gaps, with the images.

    Free while we launch. Pro alerts and the full watchlist come later, and the first readers hear first.

    • Sites where orbit and management disagree
    • Before-and-after Sentinel images, dated
    • Which claims can't be checked from space, and why
    • Sources linked for every claim
    Powered byGalloSites