Read the claim
Earnings calls · filings · permits
Every dated promise about a site gets pulled out: what, how much, by when, and who said it.
Alpha Orbit compares what companies promise about the world's biggest builds with what satellites actually see. AI data centers, chip fabs, gigafactories. Dated, measured, side by side.
Real Sentinel-2 images of the campus outside Abilene, Texas, from January 2024 to last week, next to what the companies said in public. Drag through twelve passes, or tap a statement to jump to the pass that checks it.
Crusoe · Oracle · OpenAI · Abilene, Texas
Statements are quoted or summarized from the linked public reports. The orbit notes are our reading of 10 m images.
Contains modified Copernicus Sentinel data 2024–2026. Aerial photo: USDA NAIP (public domain). Imagery accessed through Microsoft Planetary Computer.
Every site on the watchlist, with the next and last time a Sentinel-2 satellite flies over it in daylight. Worked out in your browser from today's orbital elements. Clouds still decide what each pass can see.
| Site | Owner | Next Sentinel-2 pass | Last pass |
|---|---|---|---|
| Computing passes… | |||
A language model reads the promise. A vision model reads the ground. The gap between them is the signal. Read the full method
Earnings calls · filings · permits
Every dated promise about a site gets pulled out: what, how much, by when, and who said it.
Sentinel-2 · Sentinel-1 radar · sharp captures
Free public satellites revisit every site every few days. Sharp commercial captures are bought only when something changes.
Cleared land · roofs · cooling · turbines
What a megaproject can't hide from above is counted and dated, pass after pass.
Orbit Gap · alerts · evidence
When observed progress falls behind the stated path, you get an alert with the dated images that show it.
Megaprojects are big enough to see from free satellites, and the claims about them move stocks. That's where Alpha Orbit works.
The gigawatt campuses behind the AI trade: halls, cooling, substations and on-site gas turbines.
Hyperscalers · neoclouds · powerNew fabs where the gap between groundbreaking and first wafers decides a supply chain.
Foundries · equipment makersBattery and EV plants, from cleared land to finished-car lots.
EV makers · battery suppliersExport terminals, new turbines and grid substations that feed the build-out.
Energy · utilitiesContainer stacks and ship counts at the ports that carry the parts.
Logistics · tradePits, stockpiles and tailings at the copper and lithium mines the build-out needs.
MaterialsEvery alert links to the dated images behind it. These samples show the format; the projects are made up.
At the pace orbit has seen since May, about 3 halls will be enclosed by Sep 30, not 4.
Roof closed on the Jul 18 pass; the county schedule shows late July.
No change in cleared area or foundations since May 30. The company said nothing about a pause.
Free while we launch. Pro alerts and the full watchlist come later, and the first readers hear first.